Inside this document
Every page is full-text indexed — open a page directly in the PDF viewer.
Page 1
SOP 27 – 2019 Page 1 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 SOP 27 Standard Operating Procedure for Railroad Test Cars Using a Master Track Scale 1 Introduction Pu...
Open at page →
Page 2
SOP 27 – 2019 Page 2 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 The scale, process, and standards must be evaluated to ensure that the combined standard uncertainties...
Open at page →
Page 3
SOP 27 – 2019 Page 3 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Railroad test cars must be completely dry, with no ice or moisture on the surface or under carriage of...
Open at page →
Page 4
SOP 27 – 2019 Page 4 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Equipment / Apparatus A track scale in good operating condition, with a current calibration certificate...
Open at page →
Page 5
SOP 27 – 2019 Page 5 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Pre-calibration Inspections Inspect the Master Scale 2.3.1.1 Inspect the scale deck for wear and check...
Open at page →
Page 6
SOP 27 – 2019 Page 6 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 2.3.3.3 Visually inspect the railroad test car. Check for damage, obvious loose parts; or, have a quali...
Open at page →
Page 7
SOP 27 – 2019 Page 7 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 2.3.3.6 Check security seals, if present, for tampering or unauthorized entry to sealed compartments. 2...
Open at page →
Page 8
SOP 27 – 2019 Page 8 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Remove the test car and recheck the reference indication and record observations, again, noting any dri...
Open at page →
Page 9
SOP 27 – 2019 Page 9 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 5 Assignment of Uncertainty The limits of expanded uncertainty, U , include estimates of the standard u...
Open at page →
Page 10
SOP 27 – 2019 Page 10 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Table 3. Example Uncertainty Budget Table. Uncertainty Component Description Symbol Source Typical Dis...
Open at page →
Page 11
SOP 27 – 2019 Page 11 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 uncertainties. No correction for the effect of air buoyancy is to be assumed unless stated on the cali...
Open at page →
Page 12
SOP 27 – 2019 Page 12 of 12 This publication is available free of charge from: https://doi.org /10.6028/NIST.IR. 8250 Appendix A – Types of Railroad Test Cars Monitor car. Essentially a modified freight car with approved...
Open at page →